Corporate Headquarters:

Staticworx® , Inc.
124 Watertown Street
Watertown, MA 02472

Phone: 617-923-2000
Fax: 617-923-2009

US Mail Address:
PO Box 590069
Newton, MA 02459

Manufacturing and Warehouse:
Staticworx® , Inc.
Hwy 41
Calhoun, Georgia

West Coast Distribution Center:
Los Angeles, California

West Coast Flooring Installation:

Phone: 949-933-0177
Solving ESD flooring problems for over 30 years, StaticWorx (also known as StaticWorks) installs dissipative flooring with proven antistatic capabilities. Call centers, data centers, computer rooms all need the protection provided by anti static vinyl, rubber tile or carpeting.  
 

ESD Floors : Maintaining

 

Conductive Acrylic Floor Coating for esd floors

GroundWorx Conductive Acrylic Floor Coating

GroundWorx combines permanent conductivity, durability and value for applications requiring an inexpensive, easily installed ESD floor coating. Despite the low cost, GroundWorx meets or exceeds all the recommended guidelines for static control flooring in ANSI/ESD S20.20. GroundWorx ESD floors are durable, attractive and they can be applied over most flooring materials including concrete, wood and old tile. The most impressive aspect of GroundWorx is the ease of application. It's as simple to install as conductive acrylic paint but it also provides the durability you expect from permanent ESD floors.

NOTE: This product is not recommended for applications that experience reoccurring standing water. Finished floors may be opened to light traffic, under normal curing conditions, after 12 hours. Complete curing with maximum durability and chemical resistance will take 5-7 days.

Application and Maintenance
New concrete floors should be allowed to cure a minimum of thirty days. Application to floors colder than 60 F is not recommended. Floor surfaces must be free of any release agents, curing compounds, salts or efflorescence before coating. Sweep and then wash floors with an appropriate cleaning product to remove oil, grease, and soil. Follow by etching surface with an etching solution, then thoroughly rinse with clean water.

If floor has been previously coated, a small area should be cleaned, roughed up by screen disking with an 80 Grit screen, and then sealer applied to test for adhesion, lifting, etc. Any areas of the existing coating which display poor adhesion should be stripped. Wash the stripped areas, acid etch, and rinse thoroughly. Allow the floor to dry.

Catalyzed GroundWorx should be used within six hours of mixing, therefore, prepare only the quantity necessary for immediate use. Add premeasured catalyst to epoxy base. Stir gently until the catalyst has been thoroughly mixed in. Allow catalyzed GroundWorx to stand for 5 minutes.

Apply catalyzed GroundWorx with a short nap roller in thin, uniform coats. The initial coat will cover approximately 400-500 ft2 per gallon. Allow the initial coat to dry for 5-7 hours, then apply a second coat. Second coat coverage is approximately 500-600 ft2 per gallon.

Part No. Description
sw46099 4 x 1 Gal. case

 

 

headerx topics for static free environments.

 

 

 

 

 

Technical Documents
GroundWorx MSDS

GroundWorx Catalyst MSDS

 

Web Design Company

Solving ESD flooring problems for over 30 years, Staticworx® installs dissipative flooring with proven antistatic capabilities. Call centers, data centers, data centres, computer rooms all need the protection provided by anti static vinyl, rubber tile or carpeting.